Se alt

Se den engelske version som vores officielle version.Vend tilbage

Europa
France(Français) Germany(Deutsch) Italy(Italia) Russian(русский) Poland(polski) Czech(Čeština) Luxembourg(Lëtzebuergesch) Netherlands(Nederland) Iceland(íslenska) Hungarian(Magyarország) Spain(español) Portugal(Português) Turkey(Türk dili) Bulgaria(Български език) Ukraine(Україна) Greece(Ελλάδα) Israel(עִבְרִית) Sweden(Svenska) Finland(Svenska) Finland(Suomi) Romania(românesc) Moldova(românesc) Slovakia(Slovenská) Denmark(Dansk) Slovenia(Slovenija) Slovenia(Hrvatska) Croatia(Hrvatska) Serbia(Hrvatska) Montenegro(Hrvatska) Bosnia and Herzegovina(Hrvatska) Lithuania(lietuvių) Spain(Português) Switzerland(Deutsch) United Kingdom(English)
Asien/Stillehavet
Japan(日本語) Korea(한국의) Thailand(ภาษาไทย) Malaysia(Melayu) Singapore(Melayu) Vietnam(Tiếng Việt) Philippines(Pilipino)
Afrika, Indien og Mellemøsten
United Arab Emirates(العربية) Iran(فارسی) Tajikistan(فارسی) India(हिंदी) Madagascar(malaɡasʲ)
Sydamerika / Oceanien
New Zealand(Maori) Brazil(Português) Angola(Português) Mozambique(Português)
Nordamerika
United States(English) Canada(English) Haiti(Ayiti) Mexico(español)
HjemProdukterUdviklingskort, Kits, ProgrammørerEvalueringsbestyrelser - Analog til digitale konvertere (ADC'er)ADS4245EVM
ADS4245EVM Image
Billedet kan være repræsentation.
Se specifikationer for produktoplysninger.
EXPRESS -MULIGHED
Betalingsmetode

ADS4245EVM - Texas Instruments

Fabrikant Varenummer
ADS4245EVM
Fabrikant
Texas Instruments
Allelco Varenummer
98D-ADS4245EVM
Garanti
1 år Allelco -garanti - Find ud af mere
Delbeskrivelse
EVAL MODULE FOR ADS4245
Pakke
Box
Datablad
1.ADS4245EVM.pdf ...

HTML -datablad

ADS42xx.pdf
RoHs Status
Rohs3 -kompatibel
Vores certificering
På lager: 32705
  • Pris per stk: $358.80
  • Subtotal: $0.00

Vil du have en bedre pris?
Tilføj til CART og Indsend RFQ Nu, vi kontakter dig straks.

Antal Pris per stk Ext.Pris
1+ $358.80 $358.80
Ovenstående priser inkluderer ikke skatter og fragtpriser, der beregnes på ordre -siderne.
EXPRESS -MULIGHED
Betalingsmetode
Vores certificering

specifikationer

ADS4245EVM Tekniske specifikationer
Texas Instruments - ADS4245EVM tekniske specifikationer, attributter, parametre og dele med lignende specifikationer som Texas Instruments - ADS4245EVM

Produktattribut Attributværdi  
Fabrikant Texas Instruments  
Udnyttet IC / Del ADS4246  
Medfølgende indhold Board(s)  
Serie -  
Prøveudtagningshastighed (pr. Sekund) 125M  
Strøm (Typ) @ Betingelser -  
Produktattribut Attributværdi  
Pakke Box  
Antal bitter 14  
Antal A / D-omformere 2  
Input Range 2Vpp  
Data Interface CMOS, LVDS, Serial, Parallel  
Basisproduktnummer ADS4245  

Miljø- og eksportklassifikationer

ATTRIBUT BESKRIVELSE
RoHs Status Rohs3 -kompatibel
Fugtfølsomhedsniveau (MSL) 1 (Unlimited)
Nå status REACH Unaffected
ECCN 3A991C3
HTSUS 8473.30.1180

Dele med lignende specifikationer

De tre dele til højre har lignende specifikationer som Texas Instruments ADS4245EVM.

Produktattribut ADS4245EVM ADS4246EVM ADS4229EVM ADS4242EVM
Varenummer ADS4245EVM ADS4246EVM ADS4229EVM ADS4242EVM
Fabrikant Texas Instruments Texas Instruments Texas Instruments Texas Instruments
Strøm (Typ) @ Betingelser - - - -
Serie - - - -
Antal bitter 14 14 12 14
Basisproduktnummer ADS4245 ADS4246 ADS4229 ADS4242
Udnyttet IC / Del ADS4246 ADS4246 ADS4229 ADS4242
Input Range 2Vpp 2Vpp 2Vpp 2Vpp
Antal A / D-omformere 2 2 2 2
Data Interface CMOS, LVDS, Serial, Parallel CMOS, LVDS, Serial, Parallel USB CMOS, LVDS, Serial, Parallel
Medfølgende indhold Board(s) Board(s) Board(s) Board(s)
Prøveudtagningshastighed (pr. Sekund) 125M 160M 250M 65M
Pakke Box Box Box Box

ADS4245EVM DATABLEET PDF

Download ADS4245EVM PDF -datablad og Texas Instruments -dokumentation til ADS4245EVM - Texas Instruments.

HTML -datablad
ADS42xx.pdf

kunde anmeldelser

Evaluering: 10 -artikler

  • Jess***Jones
    2026-04-17

    It offers good value for the price, and the specifications match the description. I’ve been using it for two days with no issues, and I’ll definitely buy it again if I need it in the future.

  • Mich***Smith
    2026-04-17

    Shipping was on time, the component pins are neatly aligned, and I tested 10 of them with a multimeter—all readings were within the specified range. Highly recommended.

  • Aman***arris
    2026-04-03

    It was great—the entire process, from placing the order to receiving the package, went very smoothly. The components were consistent, the price was fair, and I had a very pleasant shopping experience.

  • Mike***nch
    2026-04-03

    Better than expected! The resistance and capacitance readings were spot-on, and it passed the test on the first try. The service was reliable, and the packaging was thoughtful—I highly recommend it.

  • Daic***K.
    2026-03-23

    Very good. No issue after long time testing.

  • Kevi***.
    2026-03-17

    Fast switching and stable output. Very satisfied with this IC

  • Daou***hekebkeb
    2024-06-16

    I had a great experience purchasing items from Allelcoelec, I recommend

  • Uri ***al
    2024-06-19

    Good comunication,
    Transpnt regarding the process and price.

  • Yaqu***l Ali
    2024-06-19

    Providing reasonable prices, regular follow-up of orders, providing accurate and regular invoices, timely delivery of goods, excellent customer service and providing original goods and best quality materials.

  • Lea ***
    2024-06-19

    Morrey was very helpful and right on top of things!
    He replied quickly to my RFQ. He was very courteous and professional.

Skriv en anmeldelse

Din e -mail -adresse offentliggøres ikke.

forsendelse

Leveringstid

Elementer på lager kan sendes inden for 24 timer.Nogle dele arrangeres til levering inden for 1-2 dage fra den dato, hvor alle varer ankommer til vores lager.Og Allelco -skibe bestiller en gang om dagen omkring 17:00, undtagen søndag.Når varerne er sendt, afhænger den estimerede leveringstid af forsendelsesmetoderne og leveringsdestinationen.Tabellen herunder er den logistiske tid for nogle almindelige lande.

Leveringsomkostninger

  1. Brug din Express -konto til forsendelse, hvis du har en.
  2. Brug vores konto til forsendelsen.Se nedenstående tabel for de omtrentlige afgifter.
(Forskellige tidsramme / lande / pakkestørrelse har forskellige priser.)

Leveringsmetode

  1. Global fælles forsendelse af DHL / UPS / FedEx / TNT / EMS / SF Vi støtter.
  2. Andre flere forsendelsesmåder, bedes du kontakte din kundechef.

Almindelige lande Logistiske tidsreference
Område Land Logistisk tid (dag)
Amerika Forenede Stater 5
Brasilien 7
Europa Tyskland 5
Det Forenede Kongerige 4
Italien 5
Oceanien Australien 6
New Zealand 5
Asien Indien 4
Japan 4
mellem Østen Israel 6
DHL & FedEx forsendelsesomkostninger Reference
Forsendelsesomkostninger (kg) Reference DHL (USD $)
0.00kg-1.00kg USD$30.00 - USD$60.00
1.00kg-2.00kg USD$40.00 - USD$80.00
2.00kg-3.00kg USD$50.00 - USD$100.00
Bemærk:
Ovenstående tabel er kun til reference.Der kan have en vis datafrangement for de ukontrollerbare faktorer.
Kontakt os, hvis du har spørgsmål.

Betalingsstøtte

Betalingsmetoden kan vælges fra metoderne vist nedenfor: Trådoverførsel (T/T, Bankoverførsel), Western Union, Credit Card, PayPal.

Din trofaste forsyningskædepartner -

Kontakt os, hvis du har spørgsmål.

  1. telefon
    +00852 9146 4856

Certificeringer og medlemskaber

Se mere
ADS4245EVM Image

ADS4245EVM

Texas Instruments
98D-ADS4245EVM

Vil du have en bedre pris? Tilføj til CART og Indsend RFQ Nu, vi kontakter dig straks.

0 RFQ
Indkøbskurv (0 Items)
Det er tomt.
Sammenlign liste (0 Items)
Det er tomt.
Feedback

Din feedback betyder noget!På Allelco værdsætter vi brugeroplevelsen og stræber efter at forbedre den konstant.
Del venligst dine kommentarer med os via vores feedback -formular, så svarer vi straks.
Tak fordi du valgte Allelco.

Emne
E-mail
Kommentarer
CAPTCHA
Træk eller klik for at uploade filen
Upload fil
Typer: .xls, .xlsx, .doc, .docx, .jpg, .png og .pdf.
Max Filstørrelse: 10MB